Go back

Guide · CRAClock · EU Cyber Resilience Act

When is the CRA final report due?

By the Ingenious AI team · Published 14 November 2026 · Reviewed 14 November 2026

Short answer: It depends on the event type. For an actively exploited vulnerability, the final report is due within 14 days after a corrective measure (fix or mitigation) is made available. For a severe incident, it is due within 1 month after the 72-hour notification. Both deadlines are computed by CRAClock's incident flow from the triggering date — which is exactly why that date (fix availability, or the notification's submission) must be recorded the day it happens: the final-report clock is the easiest one in the regime to lose.

Generate your free SBOM + readiness pack →   Compare two releases free · See pricing

What is the final report?

The final report is the third Article 14 submission — Article 14(2)(c) for vulnerabilities, 14(4)(c) for incidents — that closes the reporting sequence with the complete account. For a vulnerability it describes the vulnerability and its severity, the products and versions impacted, information on any malicious actor where known, and the corrective measures taken; its deadline runs 14 days from the fix's availability. For an incident, the final report follows within 1 month of the 72-hour notification and includes the incident's nature, impact and the mitigation measures taken.

Two events, two clocks

The final stage is where Article 14's two tracks visibly diverge. A vulnerability's story ends when it is fixed, so its final report keys off the remedy: 14 days after a corrective measure is available. An incident's story is about impact and response rather than a single patch, so its final report keys off the process: 1 month after the 72-hour notification was submitted. Same stage name, different trigger, different arithmetic — and confusing them is a real-world error, not a pedantic one.

CRAClock's runbook states both rules side by side in the final-report stage, and the incident flow computes the deadline from the correct trigger for the event type on record. The vendor's part is smaller but crucial: the trigger dates must enter the record when they occur. A fix that ships without its availability date being recorded starts a clock nobody can see.

What the vulnerability final report contains

The content list reflects a completed investigation: a description of the vulnerability including its severity and impact; the information needed to identify the products and versions impacted; information on any malicious actor where known — the phrasing matters, because actor knowledge is often partial, and the report says what is known without speculation dressed as fact; and the corrective measures taken, which now exist as history rather than intention.

Notice how much of this content is generated by the earlier machinery. The impacted versions come from the SBOM and the scan that scoped the component. The measures come from the incident record's own log. The severity assessment matures the 72-hour stage's initial one. A vendor who has run the sequence inside one record writes the final report by assembly; a vendor reconstructing it writes it by archaeology, under a deadline, about their worst fortnight.

What the incident final report contains

For a severe incident, the final report completes the narrative the earlier stages opened: the nature of the incident, its impact as finally understood, and the mitigation measures taken. Where the 72-hour notification's assessment was explicitly initial, the final report is where estimates become findings — including, where the facts support it, the correction of earlier impressions, stated plainly as the record's maturation.

The 1-month clock is generous compared to the earlier stages, and the generosity is the trap: a month is long enough for the incident team to disperse, the details to blur and the task to sink under newer work. The vendors who close incidents cleanly schedule the final report when the notification is filed — the date is already computable at that moment — and draft it while the investigation's memory is fresh, letting it rest until submission rather than creating it at the deadline.

Why trigger dates get lost

The early stages have a forcing function: their clocks start at awareness, a moment everyone notices. The final report's triggers are quieter. A fix becomes 'available' inside a release process that has its own vocabulary — shipped, deployed, published — and nobody may say the words that start the legal clock. An incident's notification submission is a platform act whose date lives in a receipt nobody filed. In both cases the loss is administrative, not technical, and it happens to competent teams.

The countermeasure is to bind the trigger to the artefact: the incident flow asks for the fix-availability date when the corrective measure is recorded, and the notification's receipt — stored in the vault the day it arrives — carries its submission date. CRAClock's pattern of 'receipts in the vault, dates in the record' exists precisely because this stage's deadlines are the ones with no alarm bell of their own.

Closing the incident properly

A filed final report is not quite the end. The incident's complete file — awareness record, all stages' submissions and receipts, any intermediate report, the user notifications, the internal timeline — belongs together in the vault as the product's evidence that the duty was discharged in full. That file is what you will show a customer, an assessor or your own successor; it should be assembled while it is still warm, and the CRAClock vault is designed to hold it as one incident-shaped bundle.

There is also a learning step worth formalising: what the incident revealed about the product, the process and the preparation. The final report's discipline of stating measures and impacts makes an excellent skeleton for the internal retrospective — and the improvements it names (a pinned dependency, a sharper drill, a faster detection path) become the visible yield of an otherwise costly event.

Your 5-action checklist

  1. Record the trigger date the day it happens: fix/mitigation availability for a vulnerability; notification submission for an incident.
  2. Confirm which clock your event type carries — 14 days after the fix, or 1 month after the 72-hour notification — in the incident record.
  3. Draft the final report by assembly from the record: SBOM scoping, matured assessment, measures as history.
  4. State malicious-actor information only where known, in those words; separate knowledge from suspicion throughout.
  5. File the complete incident bundle — every stage, every receipt — in the vault, and schedule the internal retrospective.

Work through the list in order. The free CRAClock job on the home page produces the SBOM, the dated checklist and the reporting runbook that several of these actions depend on.

Worked example: a fix on day 6, a final report on day 15

A fictional vendor's vulnerability incident: awareness Monday of week one, early warning and 72-hour notification filed on their clocks. The patched version is released on day 6 — and because the release checklist includes 'record corrective-measure availability in the incident', the final-report deadline is computed the same day: day 20. The team drafts the final report during week two from the record — vulnerability description, impacted versions from the SBOM scoping, actor information limited to what logs actually showed, measures as completed history.

The report is submitted on day 15, five days early, and the incident bundle is vaulted complete. Contrast the near-miss version of this story, which the vendor's drill had rehearsed: the fix ships inside a routine release, nobody records availability, and the final-report clock is discovered on day 13 of 14. The drill is why the release checklist line exists.

Keep going

Frequently asked questions

Why do vulnerabilities and incidents have different final-report clocks?

Because their stories end differently. A vulnerability's account completes when the remedy exists, so its report keys off fix availability (14 days after). An incident's account completes as its impact is understood, keyed to the process (1 month after the 72-hour notification). CRAClock's runbook states both, and the incident flow applies the one matching your event type.

What counts as a 'corrective measure being available'?

The fix or mitigating measure your users can actually obtain — the patched version released, the mitigation published. Record the date it became available, not the date it was finished internally; that recorded date starts the 14-day clock in the incident flow.

What if there is no information about a malicious actor?

Then the report says so. The content asks for actor information where known. An explicit 'no information available' is a complete answer to that item; speculation is not. The same honesty standard runs through every stage of the sequence.

Can the final report correct something in the 72-hour notification?

Yes — that is part of its function. The notification's assessment is labelled initial; the final report presents the matured findings. State corrections as developments in the record. Consistency with transparency beats consistency by silence.

What happens after the final report is filed?

The incident closes administratively: assemble the complete file (all stages, receipts, user notifications) in the vault, and run the internal retrospective. The evidence bundle is the durable output — it is what future questionnaires, assessors and incidents will draw on.

CRAClock prepares drafts and evidence; regulatory submission is always performed by you in ENISA's Single Reporting Platform. This guide is general information about the duties CRAClock supports, not legal advice.