Go back

Guide · CRAClock · EU Cyber Resilience Act

What goes in the CRA 72-hour notification?

By the Ingenious AI team · Published 14 November 2026 · Reviewed 14 November 2026

Short answer: The 72-hour notification is the substantive Article 14 stage. Within 72 hours of awareness you report: the general nature of the vulnerability exploitation or incident; an initial assessment of its severity and impact; the corrective measures you have taken; and the measures users can take. Where a coordinating CSIRT has requested an intermediate report, that is provided too. It builds directly on your early warning — same incident, fuller account — and CRAClock drafts it from the incident record so nothing from stage one is lost or contradicted.

Generate your free SBOM + readiness pack →   Compare two releases free · See pricing

What is the 72-hour notification?

The 72-hour notification is the second Article 14 submission under Articles 14(2)(b) and 14(4)(b) of the CRA, due within 72 hours of the manufacturer's awareness of an actively exploited vulnerability or severe incident. Its four content pillars — nature, initial assessment, corrective measures, user measures — convert the early warning's alert into an account the coordinating CSIRT and ENISA can act on. In CRAClock's runbook it is generated as a draft from the incident, ready for the manufacturer's review and submission.

The four content pillars

Nature: what is being exploited, or what happened, in general terms — the vulnerability class or incident shape, stated plainly. Initial assessment: your current reading of severity and impact, explicitly initial, because at 72 hours the investigation is young and the form knows it. Corrective measures taken: what you have already done — mitigations deployed, versions patched, infrastructure contained. Measures users can take: the concrete steps available to your customers, which connects this stage directly to the Article 14(8) user-information duty.

The discipline is to answer each pillar from the incident record, not from optimism. 'Initial assessment' licenses honesty about uncertainty — saying what is not yet known is a content choice the stage explicitly accommodates. What damages a notification is not an incomplete picture but an overconfident one that the final report must walk back. CRAClock's draft assembles the four pillars from the incident's data so the author edits facts into shape rather than inventing structure under deadline.

Building on the early warning without contradicting it

The notification is read against your early warning by professionals. Consistency is therefore a quality in itself: same product identification, same event framing, with the natural deepening of detail the extra 48 hours bought. Where the picture has genuinely changed — exploitation broader than first thought, suspicion revised — say so as a development, not as a silent edit. Authorities coordinate incidents for a living; they trust files that evolve transparently and discount files that quietly mutate.

This is an operational argument for the single incident record. When warning, notification and final report all draft from one record — awareness time, product, event type, evolving assessment — consistency is the default outcome of the tooling rather than a heroic act of cross-checking between documents at hour seventy.

Writing the user measures so users can act

Of the four pillars, the user measures are the one your customers will actually read (via the Article 14(8) information duty), so write them as instructions, not as compliance prose: which versions are affected, what to update or configure, by when, and what to do if they cannot. A measure a user cannot execute is not a measure — it is a sentiment. Where no user action exists, the honest statement is what you have done on their behalf and what happens next.

Tone matters here more than anywhere in the sequence. The notification is a technical document for authorities; the user-facing version of the same content should be calm, specific and free of blame-shifting. Vendors who prepare this text inside the runbook — before any incident — discover they write it better in peacetime, and that a prepared message only needs its facts updated when the day comes.

The intermediate report, if the CSIRT asks

The runbook's stage-two notes carry an easily missed line: if the coordinating CSIRT requests an intermediate report, provide it. Not every incident draws such a request, but when one arrives it is part of this stage's world — an additional account between the notification and the final report, reflecting what has been learned since. Treat a request as routine cooperation, answer it from the same incident record, and store it with the stage's other submissions.

Vendors sometimes read an intermediate request as escalation or suspicion. It is better read as coordination: the CSIRT is assembling a picture across manufacturers and needs your current state. A prompt, consistent intermediate report is a credibility deposit with the exact people your final report will later be read by.

The 72-hour window as a work plan

Seventy-two hours divides naturally: the first day belongs to investigation and containment (which generate the corrective measures), the second to drafting and internal review (which generate the notification), the third is margin — the buffer that absorbs the surprises every real incident contains. Teams that start drafting on day three convert margin into panic; teams that draft from the incident record on day two keep the buffer intact for the unknowns.

CRAClock's incident flow supports that rhythm by making the draft a living artefact from hour zero: the notification skeleton exists from the moment the incident opens, accumulates the recorded measures as they happen, and is ready for review when the team is. The deadline then measures your investigation, not your typing — which is the correct thing for a 72-hour duty to measure.

Your 5-action checklist

  1. Draft the notification from the incident record on day two of the window — never from a blank page on day three.
  2. Answer all four pillars: nature, initial assessment (with uncertainties stated), corrective measures taken, measures users can take.
  3. Cross-check product identification and event framing against the early warning; flag genuine developments as developments.
  4. Write user measures as executable instructions and reuse them for the Article 14(8) user information.
  5. If the coordinating CSIRT requests an intermediate report, provide it from the same record and file it with the stage.

Work through the list in order. The free CRAClock job on the home page produces the SBOM, the dated checklist and the reporting runbook that several of these actions depend on.

Worked example: a notification assembled in three days

A fictional vendor's incident opens Monday 10:05 (awareness), early warning filed Monday afternoon. Tuesday is investigation: the exploited component is confirmed against the product's SBOM — it ships in 1 of the vendor's 3 products — containment ships as a configuration mitigation, and the assessment settles: exploitation attempts observed, no confirmed customer data impact yet, stated exactly that way. Each fact lands in the incident record as it firms up.

Wednesday morning the notification is drafted from the record in under an hour: nature (exploitation of a known component vulnerability), initial assessment (severity and impact, uncertainties named), corrective measures (mitigation live, patched version in test), user measures (apply the configuration step published on the trust page, or await Thursday's update). It is reviewed, submitted Wednesday afternoon — a day inside the Thursday 10:05 deadline — and the user-facing version goes to impacted customers the same day.

Keep going

Frequently asked questions

How is the 72-hour notification different from the early warning?

Depth. The early warning (24h) is an alert: event type and product identification. The notification (72h) is the account: general nature, initial assessment of severity and impact, corrective measures taken, and measures users can take. Same incident, same record, fuller content.

What if our assessment is still uncertain at 72 hours?

Report it as an initial assessment — the stage is named for exactly that state of knowledge. State what is known, what is suspected and what is still open. The final report exists to complete the picture; an honestly hedged notification never needs to be walked back.

Do we have to notify users at the same time?

The user-information duty under Article 14(8) is part of the same event handling: where users are impacted, inform them about the incident and the measures they can take. Writing the notification's user-measures pillar in executable language lets one drafting effort serve both audiences.

What is an intermediate report?

An additional account the coordinating CSIRT may request between the notification and the final report. If asked, provide it from the incident record and store it with the incident's submissions. Not every incident draws one; readiness is simply being able to produce it from a current record.

When exactly is the 72-hour deadline?

Seventy-two hours from the recorded awareness time, in calendar time. CRAClock computes it from the incident's awareness timestamp and shows it alongside the other stage deadlines, so the whole team works to the same clock.

CRAClock prepares drafts and evidence; regulatory submission is always performed by you in ENISA's Single Reporting Platform. This guide is general information about the duties CRAClock supports, not legal advice.