Go back

Guide · CRAClock · EU Cyber Resilience Act

How to report a vulnerability under the CRA, step by step

By the Ingenious AI team · Published 14 November 2026 · Reviewed 14 November 2026

Short answer: Step by step: (1) detect and triage the report against your SBOM; (2) judge the trigger — active exploitation — and record awareness; (3) within 24 hours file the early warning (event type, product identification) via ENISA's platform; (4) within 72 hours file the notification (nature, initial assessment, corrective measures, user measures) and inform impacted users under Article 14(8); (5) ship the fix and record its availability date; (6) within 14 days of that date file the final report; (7) store every receipt in the vault. CRAClock drafts each stage; you submit each one.

Generate your free SBOM + readiness pack →   Compare two releases free · See pricing

What is the reporting procedure?

The reporting procedure is the end-to-end sequence Article 14 imposes on an actively exploited vulnerability, from first detection to the filed final report and vaulted evidence. It is presented here as one continuous procedure because that is how it is experienced: a single event flowing through triage, three submissions, a user communication and a fix, with clocks inherited from two timestamps — awareness, and the fix's availability. CRAClock's incident flow is this procedure implemented as software: each step below has a corresponding place in the record.

Steps 1–2: detection, triage, awareness

Detection arrives through your prepared channels: a disclosure-page report, a scan flag on a component, a customer's message, your own telemetry. Triage is a short, disciplined examination: does the vulnerability exist in the product as shipped (the SBOM answers), is the vulnerable path reachable, and is exploitation actually occurring or credibly reported? Those three answers sort the event into routine handling or the Article 14 track.

If the track is Article 14, record awareness immediately — timestamp, source, judge, evidence gist — and open the incident. This is the procedure's hinge: everything before it is preparation and judgement, everything after it is execution against clocks. In CRAClock the hinge is the mark: a monitored CVE marked as actively exploited opens the incident with its deadlines computed and its first draft generated.

Steps 3–4: the warning, the notification, the users

Within 24 hours of awareness, file the early warning through ENISA's Single Reporting Platform: type of event, identification of the product. Draft it from the runbook, review it for accuracy, submit it yourself, store the receipt. Its thinness is intentional — do not let the investigation's incompleteness delay it. The same day, the investigation proper begins: scope from the SBOM, impact assessment, corrective measures designed.

Within 72 hours, file the notification: general nature, initial assessment of severity and impact, corrective measures taken, measures users can take — and, in the same movement, inform impacted users under Article 14(8) with those measures in plain language. If the coordinating CSIRT requests an intermediate report during the sequence, provide it from the incident record. By the end of step 4 the authorities and your users hold a true, current account, and the incident's centre of gravity shifts to the fix.

Steps 5–6: the fix and the final report

The corrective measure — patched version or published mitigation — is both an engineering deliverable and a legal timestamp. The day it becomes available to users, record that date in the incident: the final report is due within 14 days of it. Teams lose this deadline more than any other because the release process and the incident process are different conversations; bind them with one checklist line — 'record fix availability in the incident record' — in the release template.

The final report then assembles from the record: description of the vulnerability with severity and impact, the products and versions impacted (from the SBOM scoping), malicious-actor information where known, and the corrective measures taken. Submit it inside its window, store the receipt, and the submission sequence is complete — three stages, three receipts, one continuous file.

Step 7: the evidence, and the retrospective

Assemble the incident bundle in the vault: awareness record, all submissions as filed, all receipts, CSIRT correspondence, user notifications, the SBOM versions that scoped the event. Run the retrieval test — the complete chain producible in minutes — while the incident is fresh enough to repair any gap. This bundle is the durable product of the whole procedure; the incident will be forgotten, the file will be read for years.

Then hold the retrospective while memory is warm: detection lag, triage quality, drafting friction, fix time. Convert its findings into the next drill's scenario and the runbook's next amendment. The procedure's last step is how the next incident's first steps get faster — the loop that separates vendors who have incidents from vendors who learn from them, visibly, in their own records.

The procedure on the free tier versus paid

Every step above can be executed manually from the free tier's outputs: the runbook carries the stages and content lists, and a disciplined vendor with a spreadsheet and a vault folder can run the procedure faithfully. What the paid plans add is the machinery that removes the procedure's failure points: live scanning feeding detection, the incident flow holding awareness and clocks, drafts generated rather than composed, drills recorded, receipts organised by incident.

Choose based on your honest failure modes. If your risk is forgetting — deadlines, receipts, the fix-availability date — the machinery is the fix. If your product count or incident likelihood is growing, the console's per-product records stop being a convenience. Either way, the procedure is the same; only the amount of it carried by memory differs, and memory is the component this entire programme is designed to stop depending on.

Your 5-action checklist

  1. Detect and triage against the SBOM: present, reachable, exploited — three answers, recorded.
  2. Judge the trigger and record awareness (timestamp, source, judge, evidence) the moment the call is made.
  3. File the early warning within 24 hours via ENISA's platform; store the receipt the same day.
  4. File the 72-hour notification with all four pillars; inform impacted users under Article 14(8) in the same movement.
  5. Record the fix's availability date in the incident the day it ships; file the final report within 14 days of it; vault the complete bundle.

Work through the list in order. The free CRAClock job on the home page produces the SBOM, the dated checklist and the reporting runbook that several of these actions depend on.

Worked example: the full procedure in nine days

Day 0, 11:26 — a researcher reports active exploitation through a fictional vendor's disclosure page. 11:51 — triage confirms the component in the SBOM and the path exposed; awareness recorded, incident opened, clocks computed. 15:40 — early warning filed; receipt vaulted. Day 1 — scoping completes (1 product, 2 versions), mitigation published as an interim measure, assessment firmed. Day 2, 10:15 — the 72-hour notification filed with all four pillars; impacted users informed the same afternoon. Day 5 — the patched version ships; availability recorded in the incident before the release meeting ends.

Day 9 — the final report is filed, five days inside its window, assembled from the record: vulnerability described, impacted versions listed, actor information limited to what logs showed, measures stated as history. The bundle is vaulted complete — 3 submissions, 3 receipts, 1 intermediate exchange (none requested in this case), user notifications, timeline — and the retrospective schedules the scenario as next quarter's drill, with the detection path as its star.

Keep going

Frequently asked questions

What if the vulnerability is serious but not yet exploited?

Then the Article 14 clock has not started: it enters your remediation process with a priority reflecting its severity, and your monitoring watches for the state change. The procedure in this guide begins at awareness of active exploitation — but the triage record showing you assessed it belongs in your files either way.

Who submits each stage?

You do, in ENISA's Single Reporting Platform, under your organisational account. CRAClock drafts every stage from the incident record and computes every deadline; the filing act is the manufacturer's, at every stage, without exception.

What if the fix takes longer than 14 days?

The 14-day final-report clock starts when a corrective measure becomes available — not at awareness. A long fix does not breach that clock; it does raise the value of the interim measures and, if the CSIRT requests one, the intermediate report. Keep the record current throughout.

Do we report the same vulnerability separately for each product?

The incident is scoped by the products actually affected — which the per-product SBOMs determine. One event can implicate one product or several; the identification in each stage must match the scoping the SBOMs support.

Where do the receipts and drafts live?

In the incident record and the evidence vault: submissions as filed, platform receipts, correspondence and user notifications, bundled by incident. On the paid plans that is the console and vault; on the free tier, an organised folder maintained with the same discipline serves.

CRAClock prepares drafts and evidence; regulatory submission is always performed by you in ENISA's Single Reporting Platform. This guide is general information about the duties CRAClock supports, not legal advice.