Go back

Guide · CRAClock · EU Cyber Resilience Act

How to prioritise remediation: the P1 to P4 scheme

By the Ingenious AI team · Published 14 November 2026 · Reviewed 14 November 2026

Short answer: Work the queue in this order. P1: confirmed known vulnerabilities in shipped components — remediate now, and assess Article 14 if exploitation appears. P2: risk signals — downgrades and suspicious version changes — verify against OSV before the release ships. P3: changed and added components — review for provenance and need. P4: removals and informational changes — note them; they usually reduce risk. The scheme exists so a small team's limited hours land on the findings that can actually hurt users, in the order they can hurt them.

Generate your free SBOM + readiness pack →   Compare two releases free · See pricing

What is the P1–P4 remediation priorities?

The P1–P4 scheme is the priority ordering CRAClock applies across its diff and scan surfaces: P1 for OSV-confirmed known vulnerabilities, P2 for unconfirmed risk signals (pre-eminently downgrades), P3 for changed or added components requiring review, and P4 for removals and informational changes. It is deliberately coarse — four buckets, sortable at a glance — because its user is a small team in a release meeting, not a SOC with a taxonomy department. Coarseness is the feature: a scheme simple enough to be applied identically every time beats a precise one applied approximately.

Why an explicit order at all

Findings arrive unordered: a scan hit beside a diff signal beside a researcher's email, all nominally 'security issues', competing for the same two engineers. Without an agreed order, prioritisation is renegotiated per finding — which means it is decided by whoever argues loudest, whichever finding arrived most recently, or whichever customer shouted. An explicit scheme moves the argument to design time (once, calmly) and leaves execution time for execution.

The order encodes a risk theory in four lines: what is confirmed bad outranks what might be bad; what might be bad outranks what is merely new; what is new outranks what left. Every element of that theory is defensible to a customer, an assessor or your future self — which matters, because prioritisation decisions are exactly the ones later reviews reconstruct. A queue worked visibly in P-order is a process; the same work done in arrival order is a diary.

P1: confirmed known vulnerabilities

P1 is reserved for facts: a shipped component at a version inside a published vulnerability record's affected range. The response is remediation on a timeline set by contextual severity — reachability and exposure move a P1 from 'this sprint' to 'today' — and the Article 14 question rides along: is there any sign of exploitation? A P1 with exploitation evidence changes regime entirely, from queue item to incident, and the priority scheme's job includes making that escalation unmistakable rather than gradual.

Closure discipline matters at P1: a P1 closes with an artefact — the upgrade's release and its diff, the mitigation's publication, or a written acceptance with compensating controls and a review date. 'We'll get to it' is not a closure state; the queue's integrity depends on P1s being either moving or explicitly owned at a named risk. In the monthly review, open P1s are the first slide, always.

P2: risk signals, verified before shipping

P2 is the suspicion tier: downgrades first among equals, plus version changes whose destination needs checking. The work is verification, not remediation — run the OSV check, read the provenance, promote or clear. P2's service level is the release gate: a P2 does not ship unresolved, because its whole nature is 'cheap to check now, expensive to discover later'. A cleared P2 leaves a one-line record; a promoted one becomes a P1 with the release held.

Watch the P2 count as a process metric. A healthy pipeline produces few, resolves all, and can show the resolutions. A rising P2 backlog means the gate is leaking — changes are shipping unverified — and the correct response is to fix the gate, not to hire more verifiers. The scheme is diagnostic as well as ordinal: each tier's volume tells you something different about the machine producing it.

P3 and P4: review and record

P3 covers the new: added components and routine version changes. The work is review — was this addition deliberate, is this component maintained, does the change cross a major boundary worth a closer look? P3s are the supply-chain hygiene tier: individually small, collectively the surface from which future P1s are drawn, so the review's provenance question ('who chose this, and why?') is the control, not a formality.

P4 is the record tier: removals and informational changes. Removals reduce surface and mostly need a line in the release record — occasionally a check that nothing depended on the departed component's behaviour. Informational changes (metadata, scope moves) get noted and filed. P4's discipline is simply not skipping them: the complete change record is what makes the diff series evidentiary, and completeness is cheap exactly at the tier where nothing is on fire.

Running the scheme in a small team

The operating rhythm is a single weekly pass, thirty minutes: P1s reviewed for motion, P2s cleared or promoted, P3s provenance-checked, P4s filed — with the release gate enforcing P2 resolution continuously rather than weekly. Findings enter the queue from every channel (scans, diffs, disclosures) already tiered by the vocabulary rules: confirmed, signal, change, removal. One queue, one order, every source — the scheme fails if each channel keeps its own list, because cross-channel priority is the entire point.

Report the queue upward in the same language: 'two P1s, both moving; P2 clear; P3 reviewed'. Founders and customers alike can hold four buckets in mind, and the sentence's stability month over month is what turns prioritisation from an activity into a posture. When December 2027's file is assembled, the queue's history — exported from the console's records — is the remediation chapter, already written in the order the work was done.

Your 5-action checklist

  1. Put every finding — scan, diff, disclosure — into one queue, tiered on entry: P1 confirmed, P2 signal, P3 change/addition, P4 removal/informational.
  2. Enforce the release gate on P2: no signal ships unresolved; promote to P1 or clear with a record.
  3. Close P1s only with artefacts: the fix's release and diff, the mitigation, or a written acceptance with a review date.
  4. Run the weekly thirty-minute pass in strict order — P1 motion, P2 clearance, P3 provenance, P4 filing.
  5. Review tier volumes monthly: open P1s first, P2 backlog as a gate-health metric.

Work through the list in order. The free CRAClock job on the home page produces the SBOM, the dated checklist and the reporting runbook that several of these actions depend on.

Worked example: one queue, four findings, one morning

A fictional vendor's Monday queue held four items. A P1: an OSV-confirmed vulnerability in a shipped authentication library — reachable, so it took the week: upgrade shipped Wednesday, diff filed, closure recorded. A P2: a downgrade signal from Friday's diff — OSV check cleared it in ten minutes, record noted. A P3: a new component added by a feature branch — provenance confirmed with its author, maintenance state checked, approved. A P4: two removals from a cleanup — filed with the release note.

Total meeting time: 25 minutes, most of it on the P1's upgrade plan. The same four findings in arrival order — the removal notice had arrived first, the P1 third — had, in the pre-scheme era, consumed a long meeting and once produced a week where the team polished removals while a confirmed vulnerability waited. The scheme's entire value is visible in that contrast: identical findings, identical team, different order, different risk.

Keep going

Frequently asked questions

Where does a researcher's report fit in the tiers?

By its verified state: a confirmed, reachable flaw in a shipped version is a P1 (with the disclosure timeline running alongside); an unverified report enters as triage work whose outcome assigns the tier. The scheme orders verified work; triage is the machine that verifies.

Can a P2 ever outrank a P1?

A P2 about a core component in a release shipping today can demand the next hour before a low-reachability P1 demands the next day — sequencing within the week is judgement. What the scheme forbids is the inversion becoming habit: P1s are the only tier whose delay is a risk acceptance, and they should be conscious ones.

What severity data feeds P1 timelines?

The OSV record's content (severity signals, flaw class) plus your context: reachability, exposure, data sensitivity, compensating controls. The tier says 'first'; the timeline inside the tier is contextual. Both are recorded, so the reasoning is reviewable.

Is P4 ever urgent?

Almost never — that is its definition. The rare exception is a removal that breaks something (a component other features silently depended on), which re-enters as a functional bug, not a security priority. P4's job is completeness of the record, not speed.

Does CRAClock assign the tiers automatically?

The diff orders its output by these priorities and scans present confirmed matches as the top tier; the queue discipline — one list, worked in order, closures with artefacts — is the team's practice built on those outputs. The tooling makes the order visible; the habit makes it real.

CRAClock prepares drafts and evidence; regulatory submission is always performed by you in ENISA's Single Reporting Platform. This guide is general information about the duties CRAClock supports, not legal advice.