Guide · CRAClock · EU Cyber Resilience Act
The monthly CRA routine for small software vendors
By the Ingenious AI team · Published 14 November 2026 · Reviewed 14 November 2026
Short answer: One sitting, seven stops. (1) Regenerate each product's readiness checklist and read the score movement. (2) Refresh SBOMs for anything that shipped and confirm pinning is still 100%. (3) Review the month's scan results and the P1–P4 queue — P1s moving, P2s cleared. (4) Confirm the disclosure inbox is read and every report has a state. (5) Check scan-credit consumption against plan. (6) Verify the ENISA account still opens. (7) Re-read one rotating document (runbook, process document, trust page) for truth. Thirty to forty-five minutes, and the position cannot silently rot.
Generate your free SBOM + readiness pack → Compare two releases free · See pricing
What is the monthly CRA routine?
The monthly CRA routine is the maintenance rhythm that keeps a vendor's readiness position true between releases and incidents: a single recurring sitting that regenerates the measurements, reviews the queues, and verifies the standing accesses. It exists because every artefact in the programme decays — SBOMs stale, answers lapse, inboxes fill, credits drain — and decay is only ever caught by a rhythm, never by intentions. CRAClock's console is arranged so the routine's seven stops are screens in one place; the routine itself is the vendor's habit, and the habit is the control.
Why a routine, and why monthly
Readiness is a perishable state maintained against entropy: components change, vulnerabilities publish, people rotate, accounts drift. The forces are continuous but slow, which dictates the maintenance tempo — weekly is too often to be sustainable for a tiny team, quarterly is too rare to catch drift while it is cheap. Monthly is the tempo at which a 30-minute sitting can hold the whole position: nothing in the system decays faster than a month's inattention can repair, provided the sitting actually happens, whole, every month.
Anchor the sitting to an existing ritual — the first Monday, the invoicing morning, the team review — because routines attached to other routines survive motivation droughts and busy seasons. The routine's enemy is not difficulty; every stop is minutes of work. Its enemy is the skipped month that becomes a skipped quarter, discovered by a customer's questionnaire or an incident's first hour. Protect the anchor like a deadline, because for your future self it is one.
Stops 1–2: measure and refresh
Stop one is the scoreboard: regenerate each product's checklist from its current SBOM and read the movement — items closed, items stuck, any regression (a fallen pinning item is the classic). The regenerated checklist is dated, so the series accumulates; the movement, not the level, is the stop's information. Stop two is the inventory: any product that shipped gets its SBOM regenerated and diffed (the release process should have done this already — the monthly stop is the backstop that catches the release that skipped it), and the pinning ratio is confirmed at 100% across products.
These two stops share a principle: measurements are regenerated, not remembered. A checklist read from last month's PDF is archaeology; a checklist regenerated is an instrument reading. The difference costs four minutes and is the difference between managing the position and curating its portrait.
Stops 3–4: the queues
Stop three is the security queue: the month's scan results reviewed as arcs — what was found, how triaged, what closed, what is still open and why — and the P1–P4 queue walked in order. Open P1s get named owners and dates in the room, not in a later message. Stop four is the human queue: the disclosure inbox confirmed read, every report in a known state (triaged, in remediation, closed with its record), acknowledgements current. An unread report is the routine's most shameful possible finding, and the stop exists so that it can only ever be at most a month old — and, once found, never repeated.
Together the queue stops answer the month's only real question: is anything in the system waiting on us, ageing? Scans and disclosures are the two inflow channels; the routine is the guarantee that inflow meets review on a bounded delay. Everything else in the programme — clocks, customers, conformity — assumes that guarantee holds.
Stops 5–7: budget, access, truth
Stop five is the meter: scan credits consumed versus plan, cadence delivered as intended, reserve intact. A silent cadence failure (the budget quietly eaten by an automated consumer) is visible here and nowhere else. Stop six is access: sign in to the ENISA platform, confirm the account opens and the second submitter's access works — sixty seconds that prevent the worst discovery in the incident catalogue. Stop seven is one document, read for truth on rotation: the runbook this month, the process document next, the trust page after that — each checked against the current reality it describes, corrections dated.
Close the sitting by writing the month's one-line record — scores, closures, the next smallest item per product — into the vault. That line, accumulated, is the programme's diary: the artefact that shows, a year from now, a position maintained on a rhythm rather than reconstructed for an audience. Twelve lines a year is a light writing burden for the strongest continuity evidence in the file.
The quarterly layer above the routine
The monthly routine holds position; the quarterly layer improves it. Drills (one product per quarter at minimum, war room and incident flow together), the retrieval test, the consistency pass across documents, the answer-bank refresh, the Annex VII file advanced by a section — these ride a slower cadence because each is an hour-scale event, and because quarterly is frequent enough to verify closures from the previous round. The monthly sitting is where quarterly actions get scheduled and their findings get closed in small pieces.
Seen whole, the time budget of the entire CRA programme for a small vendor is roughly: 30–45 minutes monthly, half a day quarterly, plus the per-release minutes the pipeline increasingly automates. That is the honest number to set against the alternative the programme replaces — the incident scramble, the questionnaire project, the 2027 excavation — each of which costs more than a year of rhythm, in worse weeks, at worse rates.
Your 5-action checklist
- Anchor the sitting to an existing ritual (first Monday, invoicing morning) and protect it like a deadline.
- Regenerate every product's checklist; read movement, name stuck items as decisions, note regressions.
- Refresh SBOMs for shipped products, confirm pinning at 100%, and walk the scan arcs plus the P1–P4 queue in order.
- Confirm the disclosure inbox is fully read with every report in a known state; check credits against plan; sign in to the ENISA account.
- Re-read one rotating document (runbook → process document → trust page) for truth, then file the month's one-line record in the vault.
Work through the list in order. The free CRAClock job on the home page produces the SBOM, the dated checklist and the reporting runbook that several of these actions depend on.
Worked example: a 38-minute March sitting
A fictional vendor's March routine, timed by the founder's own log. Checklists regenerated for 3 products: 7, 6, 7 — the 6 is the conformity section closing in April's quarterly work (4 minutes). SBOMs: one product shipped twice; both release SBOMs already filed by the pipeline, pinning 100% everywhere (3 minutes). Scan arcs: 4 findings in March, 3 closed, 1 P1 moving with a date (9 minutes). Disclosure: 2 reports, both triaged, one closed (4 minutes). Credits: 21 of 50 used, reserve intact (1 minute). ENISA sign-in: works, second submitter verified (2 minutes). Document rotation: the trust page re-read; one sentence about monitoring cadence corrected to match reality (6 minutes). One-line record filed; April's smallest items named (3 minutes). Total: 32 minutes, plus coffee.
The log's closing note is the routine's whole philosophy: 'Nothing in March was urgent, because February wasn't skipped.' The position the sitting maintains is unglamorous and complete — which is why, when an incident arrived in May, every artefact it touched was current within five weeks.
Keep going
- Free SBOM + readiness pack — paste a manifest, get the CycloneDX SBOM, checklist and runbook.
- SBOM change-to-impact analysis — diff two releases before you ship.
- CRAClock pricing — Free, Pro $29/month and Team $79/month.
- All CRAClock guides — the full library for small EU software vendors.
- CRAClock console — products, scans, incidents, vault and trust pages.
- What should a CRA readiness checklist include?
- Why generate a fresh SBOM for every release?
- How do CRA Article 14 reporting drills work?
- How to scan your products for vulnerabilities with OSV
- What belongs in a CRA conformity evidence vault?
- What is a CRA readiness score?
- How to prioritise remediation: the P1 to P4 scheme
Frequently asked questions
What if a month is genuinely too busy?
Run the emergency version — stops 3, 4 and 6 only (queues and access), ten minutes — and run the full sitting the following week. The routine's design assumes real life; what it cannot survive is silent abandonment. A shortened, logged sitting preserves the chain of dates that makes the position credible.
Who should run the routine in a team of one?
You, at the anchored time, with the console open and the vault beside it. Solo is not an exemption — it is the case the routine was sized for. The one-line monthly record matters doubly for solo vendors: it is the continuity a successor, a partner or a diligence process will read.
Does the routine replace per-release work?
No — it backstops it. SBOM generation, diffs and scans belong to the release process (ideally the pipeline). The routine catches what the release process missed, reviews the aggregate, and handles the standing items (access, documents, budgets) that no release touches. Belt and braces, each sized to its job.
How do drills fit if the routine is monthly?
Drills are quarterly-layer work, scheduled from the monthly sitting. The routine's role is to notice ('drill due for product B') and to close drill findings in small monthly pieces. Separating the cadences keeps the monthly sitting light enough to never skip, which is its survival property.
Is the one-line record really worth it?
It is the cheapest continuity evidence in the programme: twelve dated lines a year proving the rhythm ran. In reviews it answers 'how is this maintained?' with a diary instead of a description. Write it in the vault before you close the sitting — future you is its reader.
CRAClock prepares drafts and evidence; regulatory submission is always performed by you in ENISA's Single Reporting Platform. This guide is general information about the duties CRAClock supports, not legal advice.