Guide · CRAClock · EU Cyber Resilience Act
What is the CRA's five-year support period for software?
By the Ingenious AI team · Published 14 November 2026 · Reviewed 14 November 2026
Short answer: The support period is how long a product's users can expect security updates after the product is placed on the market — a commitment that shapes backporting, version policy and customer contracts. The evidence model in CRAClock's readiness checklist tracks a documented update process with a support period of at least five years. Choose the period from your real capacity, state it identically everywhere (process document, trust page, contracts), and honour it with an update history that shows in-period versions actually receiving fixes.
Generate your free SBOM + readiness pack → Compare two releases free · See pricing
What is the support period?
The support period is the manufacturer-committed span during which a product receives security updates — the temporal half of the vulnerability-handling duty. In CRAClock it appears as part of the checklist's update-evidence item and on the product's trust page, where it is stated publicly as a plain number of years. It is a promise with an engineering budget behind it: every version inside its period must be patchable when a serious vulnerability lands, which constrains release policy long before it constrains marketing.
A promise measured in versions
Abstractly, the support period is a number of years. Concretely, it is a set of versions: every release a customer may still run inside the window, each of which must be able to receive a security fix. A vendor releasing monthly with a five-year period is notionally standing behind sixty versions — a number that collapses in practice into a policy (support the current and previous lines, with security backports to in-period releases, say), but the policy must be real: written, resourced, and consistent with what customers are told.
This is why the period belongs in the process document rather than only on the pricing page. The engineering organisation designs its branching, testing and release machinery around the commitment; marketing merely publishes it. Vendors who set the number commercially and discover the engineering cost later end up either breaking the promise quietly or paying for emergency backports loudly — both visible, eventually, in the evidence.
Choosing the number honestly
The checklist's evidence model expects at least five years, and the choice deserves a capacity audit before it is a copywriting task. Audit questions: How do our customers deploy — do they upgrade promptly or run old versions for years? How does our architecture age — can a three-year-old version still be built and tested in our current pipeline? What do our contracts already imply? The answers produce a number the organisation can defend on its worst week, which is the only kind of number worth publishing.
There is no prize for exceeding your capacity in print. A support period honoured completely at five years is a stronger market artefact than seven years honoured patchily, because the evidence — the update history — is what reviewers sample. Choose the floor you can hold, state it, and let the record of kept promises become the argument for the next enterprise deal.
Stating it consistently
The period appears in at least four places: the update-process document, the trust page, contracts and terms, and questionnaire answers. They must agree — not approximately, but identically — because cross-surface inconsistency is the cheapest finding a reviewer will ever make, and it poisons trust in every adjacent claim. Treat the number as a controlled value: chosen once, changed deliberately (with the change's effective scope thought through for existing customers), and propagated in one pass.
State it in years with a start reference a customer can compute from — the product's placing on the market, or the version's release, per your policy's actual design. A support statement a customer cannot apply to their own version is decoration. The trust page format CRAClock uses favours the plain form: the number, what it covers (security updates), and the disclosure route beside it — the three facts a reader came for.
Honouring it: the update history is the proof
A support period is honoured in public, one fix at a time. When a serious vulnerability lands, the in-period versions receive the fix or a documented mitigation; the release records (SBOMs, diffs, notifications) accumulate into the history that proves the commitment operates. That history is also the early-warning system for capacity problems: if backporting to the oldest in-period version becomes heroic, the policy — not the heroics — needs revision, before an incident makes the discovery.
End-of-support deserves the same explicitness as the period itself: versions age out on a knowable schedule, users are told before theirs does, and the trust page's statement stays current. A vendor who communicates an approaching end-of-support plainly keeps the trust the period was designed to build; one who lets versions lapse silently teaches customers to discount every future number they publish.
The period in the CRA programme
Within the wider programme the support period is a connective commitment: it gives the update process its horizon, the trust page its most-quoted number, and the conformity file one of its checkable claims. It also disciplines product strategy quietly — a five-year tail argues for boring, maintainable technology choices in the core, and against cleverness whose maintenance cost compounds. Several of the fleet's vendors describe the period less as a compliance line than as the moment their roadmap conversations became honest about time.
Set it as part of the readiness work, not after it: the checklist item that carries it (update process documented, support-period evidence) is one of the seven, and closing it forces exactly the capacity conversation this guide describes. The number that emerges from that conversation — evidenced, consistent, honoured — is one of the strongest sentences a small vendor can put in front of a customer.
Your 5-action checklist
- Audit capacity before choosing: deployment patterns, buildability of old versions, existing contractual implications.
- Set the period (at least five years in the checklist's evidence model) and record it in the update-process document.
- Propagate the identical statement to the trust page, contracts and questionnaire answers — one controlled value, everywhere.
- Define the version policy that makes the period real: which lines receive fixes, how backports happen, how end-of-support is communicated.
- Track honouring as evidence: in-period fixes shipped, with their SBOMs, diffs and user notifications filed.
Work through the list in order. The free CRAClock job on the home page produces the SBOM, the dated checklist and the reporting runbook that several of these actions depend on.
Worked example: five years, stated once, kept visibly
A fictional vendor's capacity audit found customers upgrading slowly — the median installation ran a 26-month-old version — and a pipeline that could still build releases three years back without archaeology. They set the support period at five years, with a version policy of current and previous major lines receiving fixes directly and older in-period versions patched on the same components where feasible, stated exactly that way in the process document and the trust page.
Eighteen months later the policy met its test: a serious vulnerability in a component present in a four-year-old version. The fix was backported inside the period, the release's SBOM and diff filed, users of that version notified through the planned channel. The event cost the team two days — and produced the single most persuasive artefact in their next procurement round: a support promise, sampled at its hardest point, with the records showing it kept.
Keep going
- Free SBOM + readiness pack — paste a manifest, get the CycloneDX SBOM, checklist and runbook.
- SBOM change-to-impact analysis — diff two releases before you ship.
- CRAClock pricing — Free, Pro $29/month and Team $79/month.
- All CRAClock guides — the full library for small EU software vendors.
- CRAClock console — products, scans, incidents, vault and trust pages.
- What evidence proves your security update process?
- What does Annex I require for vulnerability handling?
- CRA compliance for a small SaaS company selling into the EU
- How to answer CRA questions in procurement questionnaires
- What should a CRA trust page show procurement?
- What happens on 11 December 2027 under the CRA?
- Coordinated vulnerability disclosure for small vendors
Frequently asked questions
Does the five years start at sale, at release, or at first use?
Your policy defines the reference point — what matters is that it is defined, computable by the customer for their version, and consistent across your documents. CRAClock's trust page states the period plainly; the process document carries the precise rule behind the plain statement.
What if we discontinue a product?
Discontinuation is a communication duty, not an eraser: users inside their support period need a clear statement of what happens — final updates, migration path, end dates. Handle it in the open, on the trust page and directly to customers, and the record stays consistent with the promise made when they bought.
Can different products have different periods?
Yes — periods attach per product, like every other CRA duty, and CRAClock's per-product trust pages state each one. Portfolio consistency is nice; per-product honesty is required. A flagship with five years and an experiment with a shorter, clearly stated period is a defensible portfolio.
Is a longer period a competitive advantage?
Only when honoured. Reviewers sample the history, not the headline. Five years kept beats seven years approximated, every time — and the kept record becomes the advantage, quoted in the next questionnaire with its evidence attached.
Where does the period appear in CRAClock?
In the readiness checklist's update-evidence item (documented process with support-period evidence), in the process document in the vault, and publicly on the product's trust page on the paid plans — the same number in all three, by design.
CRAClock prepares drafts and evidence; regulatory submission is always performed by you in ENISA's Single Reporting Platform. This guide is general information about the duties CRAClock supports, not legal advice.