Go back

Guide · CRAClock · EU Cyber Resilience Act

What happens on 11 December 2027 under the CRA?

By the Ingenious AI team · Published 14 November 2026 · Reviewed 14 November 2026

Short answer: On 11 December 2027 the CRA's full obligations begin to apply to products with digital elements placed on the EU market: the Annex I essential requirements for product security and vulnerability handling, supported by an SBOM, Annex VII technical documentation, security-update and support-period evidence, and a conformity file. Article 14 reporting is not part of this countdown — it has been live since 11 September 2026. The vendors who arrive calm are those whose evidence accumulated release by release.

Generate your free SBOM + readiness pack →   Compare two releases free · See pricing

What is the CRA full-obligations date?

11 December 2027 is the date from which the main body of Regulation (EU) 2024/2847 applies in full. Before it, only the reporting chapter is live; after it, placing a product on the EU market carries the whole package of essential requirements and documentation duties. CRAClock's home-page countdown runs to this date because it is the preparation deadline for everything except reporting — and reporting readiness is the part that cannot wait for it.

What switches on

The full regime brings the Annex I essential requirements into force for products placed on the market: products must be made available with a secure configuration, protected against unauthorised access, and — the part small software vendors feel most — vulnerabilities must be handled through the product's life with security updates provided for the support period. Alongside the product requirements sit the manufacturer's organisational duties: the technical documentation, the conformity evidence and the processes that keep both true after release.

It is more accurate to picture 11 December 2027 as an evidence deadline than a behaviour deadline. Secure development and honest vulnerability handling are habits; what the date demands is that you can show them — dated, per product, and consistent with the product you actually ship. The gap between 'we do these things' and 'here is the file that proves it' is where most small vendors' remaining work lives.

The four artefacts that carry the date

First, the SBOM: a component inventory generated from the real product, refreshed per release, so that any vulnerability question can be answered against fact. Second, the Annex VII technical documentation: the product description, design and vulnerability-handling information the regulation expects to exist. Third, the update evidence: the documented security-update process and stated support period — at least five years in the evidence model CRAClock's checklist tracks. Fourth, the conformity file itself: the organised whole, of which CRAClock's evidence vault is the working container.

Each artefact depends on the others. The technical documentation references the SBOM; the update process references the monitoring that detects what needs updating; the conformity file references the reporting records. Building them in isolation produces contradictions an assessor — or a diligent enterprise customer — will find. Building them from one source of truth, the way CRAClock generates the checklist from the SBOM, keeps them consistent by construction.

What does not wait until 2027

Article 14 reporting. The early-warning, notification and final-report duties have applied since 11 September 2026 to products already on the market, through ENISA's Single Reporting Platform. A vendor who treats 'the CRA' as a 2027 project is unready today for the one duty that can be triggered without warning, by someone else's exploit, on any weekend of the year.

Customer expectations do not wait either. Procurement teams at larger EU buyers already ask for SBOMs, support periods and disclosure routes, because their own obligations make your answers their evidence. The December 2027 date is the regulatory floor of the timeline, not the market's timeline — and the market's version arrives attached to individual deals, each with its own deadline.

A realistic run-up for a tiny team

Work backwards in quarters rather than tasks. First, the inventory and checklist baseline: SBOM generated, gaps named, reporting account live. Next, the operating routines: per-release SBOM refresh, scheduled component scans, disclosure intake handling, incident runbook rehearsed once as a drill. Then the documentation build-out: Annex VII file assembled from the accumulated evidence, update process and support period written down, trust page published for procurement. Finally, a review pass that treats the file as an outsider would — checking that every claim in it points at a real artefact.

That sequence is deliberately boring. Each stage is small, dated and verifiable, and the CRAClock checklist's done/todo statuses are the scoreboard. The failure mode to avoid is the inverse sequence: documentation written first, in the abstract, with the inventory and routines promised for later — a file that describes a company that does not yet exist.

How CRAClock maps to the date

The product is organised around the two-date structure. The free job produces the starting artefacts — SBOM, dated checklist, runbook. The paid plans run the routines: live OSV scanning against the SBOM, reporting-clock automation when an event occurs, disclosure intake per product, the vault holding the conformity evidence, and the trust page answering procurement. The countdown on the home page is the visible reminder; the checklist statuses are the actual plan.

If you do one thing after reading this guide, generate the baseline. A checklist showing 3 of 7 done with named gaps is a plan; an unexamined product is a hope. December 2027 will arrive at the same speed for both — the difference is entirely in what accumulates between now and then.

Your 5-action checklist

  1. Generate the SBOM and dated readiness checklist for every product — the baseline everything else accumulates on.
  2. Confirm the reporting side is live now (ENISA account, CSIRT, runbook), separately from the 2027 programme.
  3. Start the Annex VII technical documentation file and grow it from real release evidence, not from memory at the end.
  4. Write down the security-update process and the support period (at least five years) and store both in the evidence vault.
  5. Schedule a quarterly outsider review: read the conformity file as a customer would and fix every claim that lacks an artefact.

Work through the list in order. The free CRAClock job on the home page produces the SBOM, the dated checklist and the reporting runbook that several of these actions depend on.

Worked example: a countdown that became a filing system

A fictional vendor with a single EU-facing product started 14 months before the deadline with a checklist at 2 of 7: SBOM generated, reporting understood, everything else open. They attached one habit to their existing release process — every release refreshed the SBOM and re-ran the component scan — and one habit to their month: the founder reviewed the checklist and closed the smallest open item. The ENISA account, disclosure page, pinned dependencies and update-process note fell in successive months without any single week being 'compliance week'.

By the final quarter their conformity work was assembly, not archaeology: 11 release SBOMs with diffs, a year of scan history, 2 handled disclosure reports with records, and the Annex VII file drafted from those artefacts. The counterfactual is the point — the same vendor starting in the final quarter would have faced the same evidence list with none of the history, and history is the one input that cannot be bought or hurried.

Keep going

Frequently asked questions

Does everything about the CRA start on 11 December 2027?

No. That date is when the full obligations apply. Article 14 reporting started earlier — 11 September 2026 — and already covers products on the market. Planning that treats 2027 as the single start date leaves the live duty unattended.

What is the conformity file, in plain terms?

The organised evidence that your product meets the CRA's essential requirements: technical documentation, the SBOM, vulnerability-handling and update records, and related artefacts, kept together and current. CRAClock's evidence vault is where its pieces live day to day.

How much of the 2027 work can be done with the free tier?

The baseline artefacts: the free job generates the SBOM, the dated readiness checklist and the Article 14 runbook from your real manifest. The ongoing routines — live CVE monitoring, reporting-clock automation, hosted disclosure intake, vault and trust page — are the paid plans' work.

What if we release a new product after 11 December 2027?

A product first placed on the market after that date simply starts under the full regime: it needs the whole package from its first sale, which is another reason to build the routines now — the second product inherits a running system instead of triggering a new project.

Is a product sold before December 2027 grandfathered?

Not in a way that helps planning: the reporting duties already apply to it today, and the full obligations are framed around products on the market. Treat existing products as in the programme and build their evidence with the same routines as new ones.

CRAClock prepares drafts and evidence; regulatory submission is always performed by you in ENISA's Single Reporting Platform. This guide is general information about the duties CRAClock supports, not legal advice.